OOS International BV, Ardica Construcciones SA de CV, and Omegas SA de CV.

apr 16, 2024

April, 2024

OOS International BV is pleased to announce the signing of a high-volume contract with Pemex Mexico for the construction and operation of the Wet Sour Gas Compression Station at ECO Paredon, enabling back pressure reduction to the Quesqui field, Phase 2.

This project will be executed during 2024 in the state of Tabasco, southeast Mexico.

To realize this project, a consortium has been established between OOS International BV, Ardica Construcciones SA de CV, and Omegas SA de CV.

The contract ($250MM plus) includes engineering, procurement, fabrication, and installation of the complex. Once completed, the compression station will be operated by the new consortium.

With this contract, OOS takes another significant step in its strategic repositioning within the Oil & Gas market, accelerating towards providing the various services the industry demands.

Picture: Wet Sour Gas Compression Station

Oil industry equipment installation, metal pipes and constructions.